Reorder logic

From running low to ready to order.

See what is below its minimum, what is already coming, and how quickly you normally use it. Then turn the list into draft purchase orders for review.

A young business owner keeping stock organized with Tare7

The result

Tare7 found the shortage, accounted for normal use and supplier lead time, and prepared two orders for a person to review.

Where this helps

Any business where being out of one thing costs a sale, a job or a day — and where nobody has time to walk the shelves on a Monday.

What you can stop doing

A mental list and a phone call to a supplier

The list in your head remembers whatever ran out most recently. It forgets the quiet item with a long supplier lead time until you need it. Tare7 watches every item against the rules you set.

Why it matters

A stockout costs more than the missing item. It can lose a sale, delay a job, or send someone on an emergency supply run.

A worked example

Watch the loose ends disappear, step by step.

A shop. House blend 250g, SKU RT-CFE-250, reorder point 36 with a reorder quantity of 96. Vendor ROAST-02 quotes a 7-day lead time and a 24-bag minimum, at $7.00 a bag.

  1. 1

    It falls through the point

    On-hand drops to 18, under the reorder point of 36, and the item lands in the queue. Nothing had to be noticed on a shelf.

  2. 2

    The queue shows its arithmetic

    Recent use averages 3.1 bags a day. With 18 left, you have roughly six days before the shelf is empty.

  3. 3

    The number that matters is the comparison

    The supplier takes seven days, but you only have six days of stock. Tare7 puts that risk in front of you before the shelf is empty.

  4. 4

    What is already coming is netted off

    Anything already on an open purchase order is counted first, so yesterday’s order does not become today’s duplicate.

  5. 5

    The suggestion respects the vendor

    96 bags, above ROAST-02's 24-bag minimum, at an estimated $672.00. Paper filters come up on the same pass under a min/max rule: 9 on hand against a point of 12, suggest 24, $96.00 from a different vendor.

  6. 6

    Select and draft

    Two lines selected produce two purchase orders, grouped by the cheapest linked vendor rather than one order somebody has to split. They arrive as drafts — you approve them, or you do not.

Tare7 found the shortage, accounted for normal use and supplier lead time, and prepared two orders for a person to review.

In the app

What you will actually tap, scan, and see.

Reorder queue · what fell through

RT-CFE-250

House blend 250g

6d
On hand
18 ea
Reorder at
36 ea
Suggest
96 ea
Est. cost
$672.00

3.1/d velocity · high confidence · vendor ROAST-02

RT-FLT

Paper filters ×100

16d
On hand
9 ea
Reorder at
12 ea
Suggest
24 ea
Est. cost
$96.00

Based on min/max rule · medium confidence · vendor SUPP-04

2 items selected · will draft POs grouped by vendor

Draft POs
Runway, suggested quantity and the rule behind it, per SKU. Six days of runway against a seven-day lead time is the number that matters — and the queue puts it in front of you rather than in a report.
Ledger · where the velocity comes from

RT-CFE-250 · FRONT

House blend 250g

Append-only
  • RECEIVEPO-0844 · loaded cost 7.28+96= 96
  • RELEASECounter sales · week 1-31= 65
  • RELEASECounter sales · week 2-24= 41
  • RELEASECounter sales · week 3-21= 20
  • ADJUSTReason: damaged-2= 18
On hand at FRONT18 ea
The 3.1-a-day figure is not a forecast setting. It is the release rows the register wrote, divided by the days they cover — which is why the queue can show its working.

Before you rely on it

What this feature does not try to do.

If one of these limits matters to your business, it is better to know before you move the work—not after.

  • Reorder points and quantities are yours to set. Tare7 does not compute a reorder point for you, and it does not adjust one automatically as demand changes.
  • Runway is a simple projection from recent use. It does not predict seasons, promotions, weather, or sudden spikes in demand.
  • Drafting a PO drafts it. Nothing is sent to a vendor, nothing is approved, and nothing is ordered without a person doing it.
  • Tare7 compares the vendors you linked to the item and respects their minimum quantity. It does not run bids, contract pricing tiers, or vendor scorecards.
  • Tare can review a reorder plan before you commit. It is advisory — it never places an order, approves one, or posts inventory.

Reorder logic

Set the rule once. Let Tare7 watch the shelf every day.

Reorder is included from Team at $29/month. Change plan whenever you like.